How IDC lost R1.5bn on dud steel plant

A senior IDC dealmaker, Nyathi, is challenging his dismissal after being found responsible for irregularities in a steel mill deal that could cost the state R1.5bn.

How IDC lost R1.5bn on dud steel plant
A senior IDC dealmaker, Nyathi, is challenging his dismissal after being found responsible for irregularities in a steel mill deal that could cost the state R1.5bn.